Preparation before working at height

Yunnan Linyi Bridge Machine Co., Ltd. | Yunnan Linyi Bridge Machine Leasing Company | Yunnan Linyi Bridge Machine Rental Co., Ltd.-[New Oriental Crane] [15937333617]
What are the preparations for the bridge crane at high altitude? Linyi Bridge Machine Co., Ltd. of Yunnan Province believes that everyone has this question. Let's answer this question for everyone.
The bridge erector is a device that places prefabricated beams onto prefabricated piers. The bridge crane belongs to the category of cranes, because its main function is to lift the beam and then transport it to the position and put it down.
The probability of high-altitude operations of bridge erection machines is relatively large. If a measure is not properly implemented, serious consequences may arise. For example, the accident was remembered by Yunnan Linyi Bridge Leasing Co., Ltd.: A high-altitude crash at the Shenzhen section of the Guangzhou-Shenzhen highway along the Yangtze River caused an accidental fall of the erecting machine, which was suddenly broken into the sea, and the seat belt was tied to the bridge crane. The workers were also left at an altitude of more than 20 meters and fell into the sea.
After the accident, the search and rescue boat at Shenzhen Rescue Bureau of the South China Sea rushed to the scene to carry out search and rescue work. According to a bridgeman at the site, the workers started to work at 7 o'clock in the morning. In the morning, the sea is deeper, about four to five meters. The construction workers were working on an elevated bridge over 20 meters high. Around 9:30, the bearings of the bridge crane suddenly fell off and fell into the bridge. Six workers who were under construction at that time tied their seat belts to the bridge and were brought into the sea together. The accident resulted in five deaths and one injury.
The cause of the accident was that the protective measures were not performed properly. To protect the personal safety of construction workers, the technicians of the Linyi Bridge Leasing Co., Ltd. of Yunnan Province told us that the following points should be met:
1. The equipment selection for the erection of bridges must meet the requirements of the project structure and be examined and issued by the national authoritative department for approval.
2. The force components of the bridging machine equipment must be checked and verified by experts.
3. Do a good job of protecting the bridge and protecting it under the bridge.
4. Check the connection parts of the bridge machine.
5. After the installation of the beam equipment is completed, the trial is qualified.
Yunnan Linyi Bridge Machine Co., Ltd. will uphold the strength to prove everything, to win the development of the concept of integrity, with "first-class products, first-class quality, first-class service" as the standard, to meet customer requirements for the purpose, continue to create value for customers!
For more information about bridge cranes, please visit our website to learn more about the contact manager Shen QQ

Esd Pom Sheet  is to add antistatic agent (plastic additive) to POM.ESD POM Sheet has many performance,such as excellant anti-static performance,high mechanical strength,dimensional stability,excellent machinability,good creep resistance,very low stick-slip,physiologically inert,and so on.

Anheda uses imported pom raw materials and imported equipment to develop and produce pom profiles.And our esd POM Sheet has high quality and competitive price advantage.


Esd Pom Sheet is widely use for precision gears, springs, wheels, connecting Rod , impeller blades,bearings with close tolerance, electrical engineering insulations,snapfit assemblies,automobile industry,toys, windows, water tanks and so on.

Product

Thickness(mm)

Size(mm)

Color

Density(g/cm³)

ESD POM SHEET

6-50

610*1220

beige/black

1.42


ESD POM Sheet

Esd Pom Sheet, antistatic pom sheet

Shenzhen Anheda Plastic Products Co.,Ltd , https://www.ahdplastic.com